Certification: | CE |
---|---|
Sales Methods: | Factory Direct Sales |
Qualification: | UL |
Equipment Name: Cropper-Nine Cutters
Equipment Model:MTM370/9CEquipment size:(L19699mm×(W)3210mm×(H)2957mm
Equipment Weight: about 27 T.(Excluding ingot)
No. | Item | Value |
1 | Processing capacity | |
1.1 | Ingot length(mm) | 1000~7200 |
1.2 | Ingot diameter(mm) | φ200~340 |
1.3 | Length of cut-off segment(mm) | First segment 240~950 Other segments 360~950 |
1.4 | Sample thickness(mm) | 2±0.5 |
2 | Processing quality1 | |
2.1 | Flatness(mm) | M10≤0.25 G12≤0.3 |
2.2 | Verticality(mm) | ≤0.5(9/10-inch) ≤0.8(12-inch) |
2.3 | Segment length error(mm) | ±1 |
2.4 | Chipping(mm) | ≤5(Does not contain top and tail chipping) |
3 | Efficiency and capacity | |
3.1 | Average processing efficiency (pure processing time) (min/ingot) | 9-inch:average≤6 M10:average≤7.5 G12:average≤9 |
3.2 | Auxiliary time (min/ingot) | 3-5 |
3.3 | Total processing efficiency (average processing efficiency + auxiliary time) (min/ingot) |
9-inch:average≤10 M10:average≤11.5 G12:average≤13 |
3.4 | Production capacity (by round ingot) (T/day) (Assumption: the ingot is M10, the average length is 3500mm, the work time is 22 hours a day, and the equipment utilization rate is 80%) |
About 38 |
4 | Consumable specification | |
4.1 | Perimeter of ring wire(mm) | 2960 |
4.2 | Diameter of ring wire(mm) | 0.42/0.5 |
4.3 | Average ring wire service time(cut/ingot) (Using Skywiretech technology, Skywiretech guide pulley, cooling water PH 5.5-7, COD <500mg/L, SS <400mg/L) |
0.42: 10-inch:110 12-inch:90 0.5: 10-inch:125 12-inch:100 |
4.4 | Wire tension(N) | 70-120 |
4.5 | Wire speed(m/s) | 28-35 |
5 | Consumption | |
5.1 | Total power(kw) | 47.75 |
5.2 | Power consumption(KWh) | ≤28 |
5.3 | Power supply | Three-phase 380V 50Hz 380V 50Hz |
5.4 | Water-inlet pressure(bar) | 3-5 |
5.5 | Water consumption(m3/h) | ≤5 |
5.6 | Air-intake pressure(bar) | 5-7 |
5.7 | Air consumption(m3/h) | ≤45 |
6 | Equipment specification | |
6.1 | Equipment size (mm) | 19699×3210×2957 (Including loading and unloading roller frame,) 10152×3210×2957(Excluding loading and unloading roller frame,) |
6.2 | Equipment weight (T) | 30.5;(excluding processed ingot) |
Note 1: It is required that the diameter deviation of the ingot is ±2mm; the ingot should not be twisted or bent. |
1 Environmental conditions
General cleanliness requirements;
Item | Requirement |
Electricity | Power supply: three-phase AC380V (±5%), three-phase four-wire system, effective grounding Frequency: 50Hz Capacity: 59.1KVA, total circuit breaker 100A Power supply bus: 3X25mm2 +2X16mm2 |
Compressed air (total 1 access source) | Air supply pressure: ≥5bar Air supply volume: ≥750L/min,dry air Air inlet pipe: Φ12mm pneumatic quick coupling |
Cooling water: tap water (If using reuse water, PH 5.5-7, COD<500mg/L, SS<400mg/L) |
Inlet pressure: 3bar~5bar Total flow rate: 85~100L/min Water-inlet pipe: inner diameter φ 50hose |
Cooling water drainage ( total 2 access sources) | The drainage pipe is a 90°PVC elbow with an inner diameter of Φ110mm (one on each side) |
Hoisting and transportation | Crane: over 35T, 1 Straight transport tanks (cattle): 8T, at least 4 vehicles Steering transport tanks (cattle): 8T, at least 2 Jack: 20T, 1 piece Forklift: 15T, 1 |